After creating a new virtual link, you have the option of configuring the Vlink to
run on a schedule.
-
Go to Nodes, find the desired node, and click
edit. Click Vlinks, find the
desired Vlink, and click edit.
-
Click Edit Time Varying Schedule and click
New Schedule.
Configure the following options.
Options |
Description |
On the following days |
Select the days or set of days for which the bandwidth rate
cap is enforced. |
From the following time |
Enter a time to start the bandwidth rate cap. |
To the following time |
Enter a time to stop the bandwidth rate cap. |
Set the rate to |
Enter a value for the scheduled virtual bandwidth cap. When
applying this Vlink to a transfer, the transfer's bandwidth will be
restricted by this value based on the configured schedule. |
Note: Overlapping time schedules are not supported. If there are overlapping
schedules, they are not accurately reflected in the Vlinks chart, and
precedence is indeterminate.
-
Click Update.