Moving a Share from Project to Project

In order to move a share from one project to another, the following requirements must be met:
  • The user moving the share must have download permissions for the share and upload permission to the destination project. For more information on content permissions, see Shares Terms and Concepts.
    Note: System and organization admins can move shares to any project within the current organization.
  • The destination project must be authorized with the source node of the share being moved.

All share-specific user and group authorizations and permissions on share are carried over with the share. Users and groups that had access to share through project authorization lose their access to the moved share.

  1. From the share's Settings page, go to Details > Move.
  2. Select a destination project from the projects list to move this share to that project.
  3. Confirm the move.